The Only Formula Book You Need
MBA Quant Formula Book
Your last-mile companion for CAT, XAT, NMAT, SNAP & IIFT — 500+ exam-relevant formulas with deep explanations, shortcuts, derivations and worked examples. Built by faculty, refined with AI.
Know
Every must-know formula in one place
Learn
Intuition, derivation & usage notes
Revise
Quick-recall cards before D-day
Showing 11 formulas
Important
Time Taken by One Worker to Complete a Task Alone
In this formula, T represents the time taken (in time units, e.g., hours) for a single worker to complete a specific amount of work, W (in units of work, such as tasks), at a given work rate, R (in units of work per time, e.g., tasks per hour). This formula intuitively signifies the relationship between the total work, the rate of work, and the time taken to complete it. Geometrically, it can be viewed as the ratio of the area representing work over the area representing rate. Edge cases include scenarios where W is zero, indicating no work is to be done, or R is zero, which would imply an undefined scenario since a worker cannot have a zero work rate.
cat
CAT
XAT
NMAT
Open
Important
Total Work in Terms of Time and Rate
In this formula, W denotes the total work done (in units of work, such as tasks or outputs), R represents the rate of work (in units of work per time, e.g., tasks per hour), and T signifies the time taken to complete the work (in time units, e.g., hours). This fundamental relationship reveals that the total work done is the product of the rate at which work is performed and the time spent working. Geometrically, it can be interpreted as the area of a rectangle where one side represents time and the other the rate of work. Edge cases include scenarios where either R or T is zero, which would indicate no work is done, or if either R or T is negative, which is not meaningful in this context.
cat
CAT
XAT
NMAT
Open
Important
Work Rate in Fraction of Work
In this formula, R denotes the work rate (in units of work per time unit), W signifies the total work completed (in arbitrary work units), and T represents the total time taken to complete that work (in time units). Intuitively, this formula measures how much work is done per unit of time, revealing the efficiency of the workforce. Geometrically, it can be seen as the slope of a line when plotting work done against time. Edge cases include situations where either W or T is zero, leading to ambiguous or undefined work rates.
cat
CAT
XAT
NMAT
Open
Important
Fraction of Work Completed by One Worker
In this formula, F represents the fraction of work completed (a unit-less number between 0 and 1), R denotes the rate of work (in units of work per time unit, e.g., tasks per hour), T signifies the time spent working (in time units, e.g., hours), and W is the total work required (in units of work, such as tasks). This formula calculates how much of the total work has been accomplished within a given time frame at a certain work rate. Intuitively, it shows the relationship between the work done and the total work, emphasizing the efficiency of the worker over time. Geometrically, it can be visualized as a ratio of the area representing work done to the area representing total work. Edge cases include situations where either R or T is zero, which would indicate no work done, or if W is very small, leading to potentially misleading interpretations of F.
cat
CAT
XAT
NMAT
Open
Important
Work Completion Ratio
In this formula, W_1 and W_2 represent the total work done by Worker 1 and Worker 2 respectively (in arbitrary units of work), R_1 and R_2 denote the work rates of Worker 1 and Worker 2 (in units of work per unit time), and T_1 and T_2 signify the time taken by Worker 1 and Worker 2 respectively (in time units). This formula computes the ratio of work completed by two different workers over different time periods. Intuitively, it allows for a comparison of productivity between the two workers based on their rates and time spent working. Geometrically, this ratio can be visualized in terms of areas representing work done over time. Edge cases include scenarios where either worker does no work, leading to zero in the ratio, or when the time taken is zero, leading to undefined behavior.
cat
CAT
XAT
NMAT
Open
Important
Work Rate of Multiple Workers
In this formula, R_{total} denotes the total work rate (in units of work per time, e.g., tasks per hour), while R_1, R_2, R_3, ..., R_n represent the individual work rates of each worker involved. This formula computes the cumulative efficiency of multiple workers working simultaneously on a task. Intuitively, it shows that the total work rate is simply the sum of the individual rates, emphasizing that more workers mean greater productivity. Geometrically, it can be visualized as multiple parallel lines representing the work rates, with the total rate being the sum of their heights. Edge cases include situations where one or more rates are zero, which means those workers are not contributing to the total work rate.
cat
CAT
XAT
NMAT
Open
Important
Combined Work Rate of Two Workers
In this formula, R_{combined} represents the total work rate of two workers (in units of work per unit time), R_1 and R_2 denote the individual work rates of the first and second worker respectively (also in units of work per unit time). This formula intuitively computes how fast both workers can complete a task together, effectively summing their individual contributions. The geometric interpretation can be seen as the combined height of a bar graph where each worker's rate is represented by a separate bar. Edge cases include scenarios where either worker has a rate of zero, resulting in the combined rate also being zero.
cat
CAT
XAT
NMAT
Open
Important
Work Rate Adjustment Due to Overtime
In this formula, R_{adjusted} represents the new work rate after accounting for overtime (in units of work per unit time), R denotes the original work rate (also in units of work per unit time), W_{extra} signifies the additional work completed during overtime (in arbitrary units of work), and T_{extra} denotes the time spent on overtime (in time units). This formula intuitively calculates how much the work rate has increased due to overtime efforts. Geometrically, it can be visualized as a vertical shift in the rate on a graph, indicating an increase in productivity over time. Edge cases include scenarios where no overtime is done (W_{extra} = 0), resulting in no change in the original rate.
cat
CAT
XAT
NMAT
Open
Important
Work Done by Multiple Workers
In this formula, W represents the total work done (in units of work, e.g., tasks completed), while R_1, R_2, and R_3 represent the rates of work of individual workers (in units of work per time, e.g., tasks per hour). This formula computes the combined efficiency of multiple workers working together on a task. Intuitively, it shows how the individual efficiencies contribute to the total work done, emphasizing that their combined efforts can lead to faster completion of tasks. Algebraically, it is derived from the concept of rates, where the sum of inverses of individual rates gives the total time required. An edge case to consider is when one of the rates is zero; if one worker cannot contribute, their rate should not be included in the sum, as it would make the formula undefined.
cat
CAT
XAT
NMAT
Open
Important
Total Work with Varying Rates
In this formula, W denotes the total work done (in units of work, such as total tasks completed), while R_i represents the work rate of each worker i (in units of work per time, e.g., tasks per hour), and T_i signifies the time each worker i has worked (in time units, e.g., hours). This formula computes the overall work done by multiple workers or machines with different rates working for different time durations. Intuitively, it highlights how different efficiencies and time contributions aggregate to produce total work. Algebraically, it sums the work done by each worker, which can be visualized as the total area under the curves representing each worker's contribution over time. Edge cases include situations where one or more workers do not contribute (R_i = 0), which would not affect the total work calculation.
cat
CAT
XAT
NMAT
Open
Important
Total Time for Multiple Workers
In this formula, T represents the total time taken (in time units), W denotes the total work to be completed (in arbitrary work units), and R_{combined} signifies the total work rate of all workers involved (in units of work per unit time). This formula computes the duration required to finish a task when the combined efforts of multiple workers are considered. Geometrically, it depicts the relationship between total work and work rate as an inverse function; as the rate increases, the time required decreases. Edge cases include scenarios where the combined work rate is zero, resulting in infinite time to complete the work or if the total work is zero, leading to zero time required.
cat
CAT
XAT
NMAT
Open